Most mining plays are a plan still needing capital, or a fleet fully exposed to hashprice. Paracan is neither.
01
Self-mining
Our own fleet: 4,000 S19 XP · 456 PH/s · 9 MW.
Earns Bitcoin
02
Hosting
Client fleets at our sites, 17 MW in Ethiopia today.
Earns fees
03
Development & O&M
Turnkey builds for a repeat client: 12 MW, still run by Paracan.
Earns fees
04
Equipment procurement
Sourcing, import, delivery: 20,000+ miners to date.
Earns fees
3 of 4 lines earn fees, not Bitcoin.
02 · Footprint
One platform. Two operating jurisdictions.
Headquartered in Asunción, with three data centres in Paraguay and a 20 MW site in Ethiopia — and a blueprint to develop AI sites across Latin America.
ParaguayHeadquarters in Asunción · three data centres: Altos, MRA and CBO
Ethiopia20 MW site · built in ten months · operating since December 2024
Latin AmericaRegion of our AI-site blueprint
CanadaWhere it started, 2017
Next
A blueprint for AI sites in Latin America.
Paracan has developed a blueprint to develop AI data-centre sites across Latin America — built on what we already do: securing renewable power, building turnkey and operating on the ground.
Renewable power access
Turnkey build 53 MW built to date
On-the-ground operations
03 · Infrastructure
Built, not contracted.
All 41 MW is energised, operating infrastructure — not a permit, an allocation or a plan. 27 MW is under load today.
Paraguay · owned
Altos · MRA · CBO
HQ in Asunción · Itaipú power via ANDE
Three data centres, operating since 2020
Ethiopia
Built in ten months
Built and operated · our first site abroad
Operating since December 2024
53MW built
Every square is a megawatt
Paraguay21
Ethiopia20
Built for a client12
53 MW built: 21 MW owned in Paraguay, 20 MW in Ethiopia, and 12 MW built in Paraguay for a client and still operated by Paracan. 9 MW energised and available in Paraguay: no construction, land or new energy approval needed.
04 · Energy
Computing powered by water.
Our sites draw on hydro-led national grids: Itaipú via ANDE in Paraguay, and Ethiopian Electric Power in Ethiopia.
Renewable electricity
100%
Energy cost · Paraguay
US$47/MWh
Built on ANDE supply since 2020
33MW
All-in production cost per BTCSelf-mining fleet · June 2026 model
US$53,503
From river to rack
How the power reaches the hashboards.
100% renewable
No fuel-price exposure
Off-peak by design
The fleet steps back in peak-tariff windows, for about 80% run-time, and is cooled by evaporative walls and pads rather than energy-hungry chillers.
Renewable: generation mix of each site's national grid. Cost per BTC: energy plus site overhead at August 2026 difficulty; excludes depreciation, financing and tax. Unaudited model, not a forecast.
05 · Track record
Trusted to build and operate for others.
Hosting client · 2024–2026
Bitmain
25 months
Hosted at our Paraguayan sites, February 2024 – March 2026.
Repeat developer client · 2024–2025
Two turnkey builds
2 × 6 MW
PPA, land, design, construction and miners, delivered in 2024 and 2025. Both still operated by Paracan.
06 · History
Eight years of building.
From a single site to a regional operator: from running our own machines, to hosting institutional fleets, to building and operating facilities for others.
2017
2017
Prologue in Canada
The founders begin building data centres in Canada, then turn to Paraguay's renewable power.
2018
Group founded
Paracan Group is founded.
End2019
Site 1 complete
Construction of the first data centre is completed.
Mar2020
First operations
Site 1 begins operating, and has run continuously ever since.
2020
Energy supply with ANDE
Energy supply agreement signed with ANDE, Paraguay's national utility.
2021
Site 2 online
Second site brought online. Iván Kronawetter joins to lead mining operations.
2021–22
Top-10 Litecoin
Ranked among the world's top ten Litecoin miners.
2023
Institutional hosting
Hosting-partner agreement signed with Bitmain; family-office capacity hosted.
Feb2024
Two fronts at once
Bitmain hosting begins in Paraguay, and ground is broken on 20 MW in Ethiopia.
2024
First turnkey build
A 6 MW facility delivered turnkey for a client, with ongoing operations.
Dec2024
Ethiopia operating
20 MW delivered in ten months.
2025
Repeat client
Second 6 MW facility for the same client: 12 MW under Paracan management.
2026
Own fleet
4,000 Antminer S19 XP procured for our own account.
Jul2026
Procurement mandate
1,000 Antminer S21 XP for a Paraguayan energy company.
Drag, scroll or use ← →Swipe for more
07 · People
Run by its own people, on the ground.
Jhony Harraka
Co-founder & Chief Executive Officer
Andy Jasmin
Co-founder & Chief Operating Officer
Iván Kronawetter
VP — Operations
Marlene Arguello
VP — Human Resources
Gualberto Martinez
Director of Mining Processes & Systematization
Vanessa Barrios
VP — Treasury
Daniel Pérez
Head of Accounting
Humberto Galeano
Head of IT & Software Development
08 · Community
Growing with Paraguay.
Formal jobs, skills and spending that stay in the country where the power is generated.
Local jobs
33 employees
Formal jobs: all staff registered with IPS social security.
Skills & training
In-house teams
Recruitment and training led by our own HR team, with in-house maintenance and IT teams.
Buying Paraguayan since
2020
Construction, metalwork and electrical engineering contracted from national industry.
Contributing locally
5 municipalities
Municipal taxes paid in the five municipalities where we operate.
09 · Investor access
Request investor materials.
For funds, family offices, strategic partners and lenders. We respond personally.